ALONG WITH FLEX SPACE FOR CLASSROOMS
Studio Architects will start drawings for the new stadium at John Marshall High School along with a new flex space of classrooms. The plan is to have the drawings ready for bidding by summer 2023. The stadium is going to be approximately at the same place the current practice field. The flex space will extend east from the auditorium. Mrs. Ambriz, principal, will be able to design the space to fit the needs of her students.
More information and specifics will be coming in future Bear Tracks.
Commenti